GENERAL PLAN OF CONSTRUCTIONS OF NATIONAL FACILITIES
FROM KING GEORGE ISLAND, CHILEAN ANTARCTIC

Client: Chilean Air Force.

Date: 2022 – 2023

Scope: Development of detailed engineering and complementary studies with information related to the logistics necessary for subsequent construction, detailed planning and the costs associated with it, the operating expenses of the facilities that are planned to be built and the tests and simulations that are considered necessary. to achieve an optimized design.

Including:

  • Design of general urbanization systems.
  • Antarctic Base Station: Administration and Services Building, Residential Building (4,440m2). Logistics Center (1,685 m2).
  • Demolition and removal.

Investment: $911 million.

Current status: In development.